Last week the tin roof on the scaffold was removed as we have now finished the roof. Tomorrow (16-5-14) we will fit the bathroom window and door which we have been waiting for. The plastering has been done and the […]
Last week the tin roof on the scaffold was removed as we have now finished the roof. Tomorrow (16-5-14) we will fit the bathroom window and door which we have been waiting for. The plastering has been done and the […]
We installed wooden flooring and repainted the entire interior of this house in Chiswick and the last job is to refurbish the garage which was leaking. We re-did the roof with GRP and plastered the inside putting insulation on the […]