22nd March: Even though it is cold, moral continues to be good. The guys were singing when I arrived on the site today. We met with the Building Control Officer and he was happy with the structural side of things. His next visit will be to sign off the insulation once this has been done. The lower bathroom was completely stripped out today, the roof joists are in and lunch was cooking on the hob when I arrived!